Skip to content
The entry point

The PDP Assessment

A paid assessment of your company’s readiness to become AI-native, scored against People, Data, and Process. It finds the people who can carry the work, maps what they can reach, and produces a plan.

What you are left holding

It stands alone. If you never buy anything else from us, you have your champions named, your systems mapped, and three things you can start on Monday.

The premise

People are the mechanism

Not the heaviest of three inputs, but the mechanism. Identify the people who can be champions and upskill them to the level they need to succeed. Get the data into their hands so they can move. Those two things change the process by definition, and the company’s job is to understand its own processes well enough to see what is changing and accept that it will.

The PDP Assessment finds those people, maps what they can reach, and produces the plan. The framework behind it explains why the order holds.

Who it is built for

The shape of company this fits

Size
$10–150M in revenue
Technical bench
Zero to two IT people, often an outsourced provider
Posture
Companies that understand they need to become AI-native, and are not
How it runs

Six steps, three to four weeks

The sequence is load-bearing. Each step is designed to test what the one before it produced.

  1. 01

    Executive interview

    90 minutes

    The CEO and their direct reports nominate the people already using AI without being asked, and we fill in a first pass at the systems inventory live, in the room.

    It runs before the survey so the nominations are unaided. Once leadership has seen what the company said, you can never know who they would have named on their own.

  2. 02

    Company survey

    Five minutes, everyone

    Goes out from the CEO within 48 hours, names required, open for one week. It asks what people already use, how deeply, and what they cannot reach.

    This is the only instrument the company answers for itself. Everything else runs through leadership’s line of sight.

  3. 03

    Resource inventory

    Completed by the company

    The systems list is finished off: what each one holds, whether AI can reach it, whether the data is trusted, and who holds the keys. Unknowns are marked as unknown, which is itself a finding.

  4. 04

    Champion interviews

    45–60 minutes each

    One at a time, with leadership’s completed inventory in hand. We screen for two things at once: whether they know the business deeply, and whether they have the aptitude to build. Either one alone fails.

    Always including at least one person the survey surfaced that leadership did not name.

  5. 05

    Findings meeting

    With leadership

    Early findings and clarifications, before the report is written. Nothing in the final document is a surprise.

  6. 06

    The report

    Scored and evidenced

    A scored current state, a twelve-month potential, named champions with what each one needs, a corrected picture of the data landscape, quick wins, and the plan between the two.

Scoring

Scored by us, from evidence

Three layers, scored one to ten against eight sub-dimensions. Never self-scored. The evidence comes from the interviews, the survey, and the corrected inventory.

People

ChampionsDepthPermission

Whether the people exist, whether they know the business deeply enough, and whether they have the authority and the hours to act.

Data

ReachabilityTrustOwnership

What AI can reach, whether the data in it can be believed, and whether one person holds the only set of keys.

Process

ClarityWillingness

Whether the company understands its own processes well enough to see them change, and whether it will let them.

The PDP Index

The Index is the geometric mean of the three layer scores, not the average. A weak layer drags the Index down rather than hiding behind two strong ones, which is the framework’s claim expressed as arithmetic. Each layer also carries a twelve-month potential and a plain statement of what stands in the way, marked as yours to move or not.

The report

What lands on your desk

  • A scored current state across People, Data, and Process
  • Your champions named, with what each one needs to succeed
  • A corrected picture of your data landscape, including what leadership had wrong
  • Quick wins you can start on Monday
  • A twelve-month potential, and the plan to reach it

All of it drawn from your own people. Nothing in the report is a proposal. You specified it.

On champions

Three at minimum, eight at the ceiling

One champion is a bottleneck with a title. Two is a project that ends when someone gets busy. Three is where it stops being one person’s initiative, and it is also the point where the list cannot be filled from a single department.

The upper bound is set by time, not enthusiasm. Every champion needs roughly two hours a week, and it has to come from somewhere real.

After the PDP Assessment

Three ways the work gets done

The PDP Assessment scopes which of these you need and who from your company goes into it. Plenty of companies take the report and run it themselves, which is a fine outcome.

Start here

Find out what you are working with

Most companies are further along than leadership can see, and further behind on data than they think. The PDP Assessment tells you which.